Nicolas Graveline

Senior Analyst Energy Efficiency and Greenhouse Gases, PERENIA Carbon

2048SydneyNew South Wales - Australia

Nicolas Graveline
69 contacts
Since 2011

Consultant in Energy Efficiency Opportunities, NGER Audits and Greenhouse gas reduction

Engineering - Projects management
Professional experience

1. CONCEPT AND DETAIL DESIGNING
- Concept Design of Sewage Treatment facilities for Recycling (MBR plant for 12000 EP) - ,
-Optimisation of a Water Recycling Scheme – Flow Structures, Chlorination, UV Treatment (Concept Design) ,
- Design Process for a Contaminated Soil Treatment Plant (6 weeks in Doha, Qatar + 4 weeks in North Sydney)
- Pumping station for sewage or clear water (mainly for Sydney Catchment Authority and Councils in NSW).

2. Planning
- Development of work schedules and work sequences,
- Resources Allocation,
- OPEX and CAPEX estimation of projects. Energy and chemical consumption.

Engineering - Projects management
2009 - 2010

Dessalinisation Plant Kurnell - Sydney, Australia.

1. CONSTRUCTION VERIFICATION ON SITE
Verify idenpendently that:
- the Contractor's work on site complies with the requirement of the contract and that mechanical devices (water treatment modules, RO Membranes, chemical storage, pumps, blowers, piping, accessories...) and the global system are built as defined by specications.
- Inspect and validate the commissioning work.
- Aknowledge that the progress of the work complies with the Master Program.

2. QUALITY CONTROL VERIFICATION
Verify idependently that :
- the technical specifications, the related technical data sheets, the quality documents for the procurement and that the procedures (for testing (Inspection &Test Plan (ITP) or achievement of specifical tasks) are in accordance to quality specifications from Contractor and australian standards.
- validate closure of Worklots.


3. REPORTING
Write mechanical part of the Weekly and Monthly Report which gathers the Non Conformance Reports (NCR), the Issue of Concerns (IoC) the Request For Information (RFI), give the status of work and report delays detailed per zone and work package.

Engineering - Projects management
2006 - 2008

Engineer Product Manager - Submersible Sewage Pumps at Salmson

1.PRODUCT RANGE DEVELOPMENT :
- define the product’s functional specification for new products after analyse of the markets needs, technical survey of competition and benchmarks.
- optimisation/standartisation of the product range

2.PROJECT MANAGEMENT:
- coordination of the different actors in France and Germany involved in the product development (Engineering, marketing, purchasing, quality, production and logistics),
-Planning of the Time to Market.

3.TECHNICAL SUPPORT FOR SALES FORCES, SERVICE & MARKETING.

Metal
2005 - 2005

1. MAPPING OF THE CLEAR WATER NETWORK OF WEST JAKARTA - INDONESIA:
- Analyse of hydraulic characteristics in water distribution network to design a flow simulation model using Stella,
- Trained a team to use the tool after its elaboration.

2. WATER TREATMENT ENGINEER:
-Perform studies, and build up solutions to increase the efficiency of water sanitation on three different water plants.

Water - Electricity - Gas
Education

Visitors to this profile also viewed these profiles
Sabrina Perez
Flow Manager, Louis Vuitton Malletier
Marc-Andreas Albert
Web Entrepreneur
Amélie AY
Webmestre, chargée de communication
Matthieu BARON
Ingénieur Assurance Qualité Projet Véhicule électrique, RENAULT
Henri Civier
Civil Engineer - Hydraulic Schemes
Alexis De Maupeou
Consultant Sénior, Tournelle Consulting
Matt Long
UHireIt.com
Julien Robert
ENGINEERING mANAGER, cOLDLOGIC
John Atkinson
Partner, Adelaide Sailing.com